Sides of the depot assembled.

Image
Merry Chirstmas! Work continues on the Mopac's Blue Rapid, KS, depot. I've assembled the depot exterior walls and completed the asbestos siding on the ends. All windows are glued in. The bay window piece isn't glued in yet as I want to finish the interior to include the floor and walls. I received another order of styrene from Evergreen so I can work on the exterior corner trim pieces. I still need to install the interior trim around the windows/door and the wainscoting. I'm waiting for temperatures to warm up to allow me to airbrush.   South side of the depot Interior view looking west - awaiting floor, interior walls, and finishing North side of the depot - minus the bay window

Blue Rapids depot progress

Image
  Progress images of the Blue Rapids, KS, depot build. I tackled the north side of the depot along with the bay window. You'll notice the skirting and asbestos siding are lower on the bay than on the side of the depot. The bay window as added in 1911 - 40 years after it was originally built in 1871 (haven't found documentation that it's not the original depot). All the door/windows and the bay are test fit. I still need to build and paint the trim pieces. Once the bay is installed, I will then assemble the four sides of the depot.   Line marks for asbestos siding installation.       Test fit of windows, doors, and the bay   Bay window   Down view of the bay window showing the four laminated sheets of .020 styrene   Interior view of the bay with windows test fit.