Posts

One of my favorite pictures

Image
Here is a picture from circa 1964 of Milford Godsey getting ready to hand up orders to the caboose. I hope to have an oil painting of this ready to present Milford (who's 93) this Christmas. (Picture enhanced by Keith Wilhite)

1970 Waterville depot picture

Image
Waterville, KS, depot circa 1970. Notice the Chicago and Eastern Illinois boxcar behind the depot for grain loading.

Beggining of a new module

Image
Yes, I have yet to complete a single module and I'm embarking on building a new module that focuses on the Coon Creek bridge located just west of Waterville, Kansas. I'm going to use Scale Segmental Bridge Co. pre-cast Mopac bridge sections for the bridge. As you might note, the bridge sections match exactly with the SSBCo parts. I'm going to scratchbuild the DPG bridge. Micro Engineering bridges are close, but I want exact. I hope to have this short module complete (ready to run maybe not scenery) by the November RPM show near Wichita. Thus starts the adventure.

Update 25 July 2010

It's been forever since I last updated my blog. Some notes that I've learned. If you're a total novice at track laying and building, it's better to purchase pre-built components from the likes of Micro-Engineering instead of doing what I'm doing and building from scratch basically. Construction goes faster and you don't get discouraged. I have learned the proper (for now) order of laying my track. I learned the roadbed should go on the drawn out template. Next should come the ties (Central Valley branch line tie strips in my case). I've been using Modge Podge to glue everything down. Time will tell if this is a good idea or not. Next the rail (pre-drill holes for feeders and solder wires to the rails). I've been having mix results with the barge cement method of attaching the rails to the ties. After I finish the first module, I hope to have photos posted. My layout may get down in the next 10-20 years. Ha ha ha.

Fixed the table legs

Today I fixed the wobble in the table legs. I used some of the scrap 1/4 Lauren that I have to brace them. Works great. I need to get one more piece for the foam cutter and then I can begin cutting out my roadbed. I built the rest of the Bullfrog turnout controls. I need to stop by the hobby shop and get airbrush supplies. I plan to spray the ties and tie plates. Can't wait until after the 15th when I can really get some work done on my modules.

Fast Track orders arrived

My Fast Tracks order arrived. I built three of the Bullfrog turnout controls. Super easy to build and I'll give a full review once I get one installed. I installed the leg levelers on one of my modules. I'm not fully satisfied with how the legs turned out and will try to improve the wobbliness. Work has kept me from my layout. I hope once after the 15th of March, I can get some real progress done. Sorry no pictures.

Progress

I've placed an order with Fast Tracks for their Bullfrog turnout control. They look easy to install and are simple. I'm hoping my 2" foam does not interfere with the operation. I also ordered a new tip for my soldering iron and some super thin solder from Fast Tracks. I hope this solves my soldering issue. Since the order is coming from Canada, it should take about 2 weeks to get here so I'll have to find a project to work on in the meantime. Maybe I can finally install the levelers in the layout legs.