Progress

I've placed an order with Fast Tracks for their Bullfrog turnout control. They look easy to install and are simple. I'm hoping my 2" foam does not interfere with the operation. I also ordered a new tip for my soldering iron and some super thin solder from Fast Tracks. I hope this solves my soldering issue. Since the order is coming from Canada, it should take about 2 weeks to get here so I'll have to find a project to work on in the meantime. Maybe I can finally install the levelers in the layout legs.

Comments

Popular posts from this blog

Sides of the depot assembled.

Work continues on the Blue Rapids depot build