Cement bridge progress

I have stained my Scale Segmental Bridge Co. cement sections with three different washes of diluted craft paint. The pans are currently being glued. Next step will be to drill holes in the piers to accept brass pins and then glue everything together. This has turned in to a fun project. I thought ahead this time and installed the bridge number before assembling everything together unlike my last bridge I built.

Comments

Popular posts from this blog

Sides of the depot assembled.

Work continues on the Blue Rapids depot build