Step 1: cutting complete

I have removed the rope pulls and the airline brackets.  Plus I sanded down the parting material on the bottom of the center bay.  Next will be filling of the grab iron holes.


Comments

Popular posts from this blog

Work continues on the Blue Rapids depot build

Sides of the depot assembled.