Posts

Move

Due to work, I've relocated to Louisiana.  My time is mainly taken up by work so I have little progress to show for the model railroad. I've had to place my modules in storage and all of buildings and rolling stock is in boxes.  I'll be leaving the country in January for many months so no progress for about a year unless I am able to take a few items with me to work on.  I'm going to see if I can build several Mopac FMC 4526 cuft covered hoppers the remainder of this year.

Work on Mopac GP18 1976

Image
Wow! Where has the time gone? I haven't updated for over 6 months. I have had some modeling block, but I feel I can get back on track again. Current project is the shell for Mopac GP18 1976 - the Bicentennial unit. Doug Brush provided several pictures to me of the unit on the Northern Kansas line and I feel obligated to include a model of the engine. I attached an Atlas SD24 cab. I had to modify the P2K long hood by chopping down the tab that guides the cab into the long hood. It's sitting on a sacrificial walkway and P2K frame. The actual 1976 had AAR trucks, a larger fuel tank, and several other differences.

Update on what I've been working on

Image
I've been slow at providing updates to my model railroad. I'm currently working on a Missouri-Illinois 4740 cuft covered hopper. These covered hoppers were built in 1966 and share much in common with Pullman-Standards earlier 4000 cuft covered hoppers. They had 12 - 30" round roof hatches and a high brake. Nate

Static Grass Progress

Image
I've been working on installing static grass on my Coon Creek bridge module. I've tried different techniques and I've decided that I like applying 2mm grass and then immediately applying 6mm grass while the glue is still wet. The other method that worked good, but is more messy is applying 2mm thickly then waiting for the glue to dry and then using hairspray to apply the 6mm. I like how thick it makes the 2mm grass, but I don't like the extra mess and clean up the hairspray makes. I had an issue with my grass being too thin in one area and I used the hairspray to thicken the grass application and it works well for that use. The scene I'm trying to replicate without the snow. Static grass is one of those applications that looks much better in person instead of when photographed. My application is much more varied and patched compared to what the pictures show. Next step is to complete the grass application, then add the fence, shrubs, and brush.

Static Grass Application

Image
My static grass application from earlier. It came out spotty and not very even. I worked on my applicator and I think I've fixed it. I need to work on layering the grass a little better and try the hair spray technique.

Static grass progress

Working on installing static grass on the Coon Creek bridge module. I got spurred on by a friend and I'm hoping to continue with my progress. My static grass did not go on evenly. I think loose grounding wire is the culprit. I now have soldered my leads and wires so everything should work good again. Since it's late, I'll fire it up tomorrow. Hopefully with pictures to follow.

Waterville circa 1977-1982

Image
This picture was taken of Wateville looking west between 1977 and 1982. The train order signal in the picture came from Blue Rapids after the Blue Rapids depot was sold and moved off location. In 1982 the Waterville depot was moved. Great looking picture for modeling because the double privy can been seen and the tool shed has two track car drops. Milford Godsey's, Waterville station agent, vehicle is seen in the left hand side of the picture. The dirt path to the left of the tracks is where the old passing siding was located during the Passenger train era.